The Line 3 (Aqua Line) is a operational line of the Mumbai Metro, running from Aarey JVLR to Cuffe Parade. It covers a distance of 33.5 km through the heart of Mumbai. The line was inaugurated on 7 October 2024 (Partial), 9 October 2025 (Complete) and serves 27 stations along its route. The Colaba-Bandra-Sheeps Mumbai Metro Line 3 is also known as the Aqua Line. the Mumbai Metro Rail Corporation (MMRCL) is currently working on expanding the metro line Once completed, the 33.5 km long Mumbai Metro Line 3 will become Mumbai’s first underground metro. This subway has 26 subway stations and 1 stop at the grade station One of the first fully underground metro corridors in the city is Mumbai Metro Line 3, which is also referred to as the Aqua Line. A total of 27 stations are located along the line, where 26 stations will be underground and 1 station at grade. The Mumbai Metro Line 3, also known as the Aqua Line, is rapidly transforming the city’s commuting landscape, with two phases already operational and the final stretch nearing completion. This fully underground corridor is proving to be a game-changer for officegoers and residents alike, significantly alleviating traffic congestion, slashing travel times, and seamlessly integrating with existing and future transit lines. The project stands as a testament to Mumbai’s commitment to ...