In 10 carts

Price: ₹ 133.000

Original Price: ₹ 470.000

50% off
New markdown! Biggest sale in 60+ days

Green line metro: Expected to be fully operational

You can only make an offer when buying a single item

Add to cart

Expected to be fully operational in 2030, the Green Line metro in Mumbai is an under-construction project. It is a fully elevated metro route planned to provide Mumbai residents hassle-free travel experience with seamless transportation alternatives. The Green Line is a line on the Namma Metro rail system. As of 2025, the line is 33.46 km (20.79 mi) long and connects Madavara in the northwest to Silk Institute in the south. Green line metro route connects the Inderlok area with the Brigadier Hoshiart Singh metro station in Bahadurgarh, Haryana. Green Line metro route is a popular metro line along NH9. Know more about the green line metro route. Mumbai Metro Line 4 (Wadala – Kasaravadavali) metro corridor is 32.32 KM fully elevated and consists of 32 stations from Wadala to Kasarvadavali.

4.9 out of 5

(29907 reviews)

5/5 Item quality
4/5 Shipping
4/5 Customer service
Loading